星鸿娱乐注册平台登录

Welcome to Suzhou Suxichang Decoration Engineering Co., Ltd. official website
18550904151
张家港哪个装修公司好

success case

Successful cases

hot key words

contact us

Phone: 18550904151

Mobile: 18094259213

Website: shjsyjs.com

Email: 2718384026@qq.com

Address: No. 101-102, Building 1, Heng Daya Garden, Zhenxing Road, Zhangjiagang City, Jiangsu

Restaurant decoration design

Your current location : Home > Products > Restaurant decoration

Restaurant decoration design

  • 餐饮店装修设计
  • Category: Catering decoration

  • Price: ¥ 0
  • Stock: 0
  • Release Date: 2019/04/19
  • Product is out of stock
  • Detailed introduction
  • product review

When renovating, more and more people like to install integrated ceilings, especially the kitchen and bathroom. The overall suspended ceiling is very simple and easy to use, but the installation method is more complicated. So what is the installation method of integrated ceiling? What are the precautions for integrated ceiling installation? The following editors will introduce the details of the integrated ceiling installation method. In order for some friends to have no idea about the future installation, you can refer to the following.

I. Keel Installation

Keel installation is an important part of the overall ceiling installation. As long as the keel is installed, the steps will be smoother.

1. When installing the keel, pay attention to the keel size, keep the main keel parallel, insert the triangle crane into the triangle keel, and then fix it on the main keel. Adjust the keel spacing to 300 mm and fix the triangle keel.

2. Specific method: Subtract 5mm from the installation length and intercept the required triangle keel. After the triangle hanger is inserted into the triangle keel, the triangle hanger is clamped on the main keel. Please note that the same triangle keel suspension is clamped on the main keel, the card is in the opposite direction, and the rear installation will not change.

Installation of fasteners

Press the gusset plate into the middle of the triangular keel joint so that the gusset plates are perpendicular to each other to ensure that the horizontal and vertical lines are on the same line. When installing a row of gusset plates, use an art knife to cut the gusset plates symmetrically, and the cutting edges should face the wall. Pay attention to the beauty, control the gap of the first row of gusset plates, the gusset plate spacing is 0, the four corners are "ten", and the gusset plate height

Third, electrical installation

After the installation of the appliance, if there is a power connection, field tests are required. Do not modify the circuit of the baby bathtub without permission. If you replace it, it will burn out the baby fish tank.

Check for leaks all around to ensure the smooth flow of lines and other infrastructure. Predict the height of the room after the installation of the integrated ceiling to make the corner line easier to install. Check the strength of the installation. If the strength does not meet the requirements, reinforcement is required. . Remedy.


    No evaluation information!

URL of this article: http://shjsyjs.com/product/645.html

Keywords: Zhangjiagang decoration company , Zhangjiagang good decoration company , Zhangjiagang which decoration company is good

Previous: Nothing Next: Nothing

Recently Viewed:

    18550904151

    contact us

    Phone: 18550904151

    Mobile: 18094259213

    Website: shjsyjs.com

    Email: 2718384026@qq.com

    Address: No. 101-102, Building 1, Heng Daya Garden, Zhenxing Road, Zhangjiagang City, Jiangsu

    QR code

    格林春天

    Scan and follow us

    online service
    share it One-click sharing
    姚记亚洲星鸿娱乐注册平台登录 蒙特卡罗官方赌场网址 龙成国际38元免费彩金 凯发电投网站 乐艺彩票下载平台 彩票pk注册网址 三分彩官网集团 大地彩票计划app 赌博十大平台注册页面 信誉正规的赌城平台娱乐网站